Cable Assembly · Battery Cable Assembly
Battery Cable Assembly: Built To IPC/WHMA-A-620 Class 2 Or 3.
Battery Cable Assembly programs built on the Cavite floor — Philippine origin outside the China-specific Section 301 tariffs, IPC/WHMA-A-620 Class 2 acceptance by default, Class 3 on request. Send the drawing or part number and we acknowledge the RFQ the same working day (Mon–Fri) and send the quotation within 3 working days.

Buyer Reality
Common Battery Cable Assembly Build Problems.
Issue #01
Fuse nuisance-opening on inrush
A fuse sized without inrush in mind can open at switch-on. Fuse rating and type follow your drawing; we do not change the specified fuse.
Issue #02
Bus-bar plating in salt exposure
Poorly bonded plating on bus-bars can flake in salt exposure and raise contact resistance. Plating follows your BOM; salt-spray tests, where specified, are run by third-party labs.
Issue #03
Battery cable colour-code mismatch causing reverse-polarity hookup
Black + Red colour-code mismatch on battery cable cuts causes reverse-polarity hookup on field swap.
Issue #04
Battery harness shipped with or without the battery
UN 38.3 testing applies to lithium cells and batteries, not to a harness on its own. If a battery ships with the harness, the battery maker's test summary is needed; confirm what ships at quotation.
What We Build
Battery Cable Assembly Equipment and Process in Cavite.
Battery cable assembly crimping: Easy360S with crimp-force monitoring
Cavite runs one Easy360S automatic crimper with crimp-force monitoring, 10 semi-automatic presses and 30 applicators, and 4 wire cutters holding ±0.2 mm. Wire from 30 AWG to 120 mm², up to 128 circuits, lengths from 15 mm to 50 m.
100% continuity testing, sampled pull and cross-section checks
Every battery cable assembly is continuity-tested on a QJ100-256 tester. Crimp pull force (TSD-010 tester) and cross-sections (TSA-001 analyser) are checked per the approved sampling plan, lots are sampled to AQL S-2, and inspection records are kept for 3 years.
What is not done in Cavite for battery cable assembly
HiPot (dielectric withstand) testing is not done in Cavite; where the drawing requires it, the test is done at Hebei Cloom, China, and the quotation states the route. IP-rating, salt-spray and other environmental tests are run by third-party labs.
IP-rating, salt-spray and other environmental tests run by third-party labs when the drawing calls for them
Qualifying Philippine origin outside the China-specific Section 301 tariffs
Easy360S automatic crimping with crimp-force monitoring, plus 10 semi-automatic presses
FAQ
Battery Cable Assembly FAQs: MOQ, Lead Time, Testing.
Q.01What is the minimum order quantity for battery cable assembly?
+
What is the minimum order quantity for battery cable assembly?
Q.02What lead time do you commit to on battery cable assembly after RFQ?
+
What lead time do you commit to on battery cable assembly after RFQ?
Q.03Are battery cable assembly shipments subject to the China Section 301 tariffs?
+
Are battery cable assembly shipments subject to the China Section 301 tariffs?
Q.04Do you ship battery cable assembly samples for free?
+
Do you ship battery cable assembly samples for free?
Q.05Can you handle the battery cable assembly engineering review before we have a finalized drawing?
+
Can you handle the battery cable assembly engineering review before we have a finalized drawing?
Q.06How is battery cable assembly packed for shipment?
+
How is battery cable assembly packed for shipment?
Q.07Can you support PPAP Level 3 for battery cable assembly?
+
Can you support PPAP Level 3 for battery cable assembly?
Q.08How are battery cable assembly failures screened before shipment?
+
How are battery cable assembly failures screened before shipment?
Q.09What warranty applies to battery cable assembly?
+
What warranty applies to battery cable assembly?
Q.10Are tooling fees required for battery cable assembly?
+
Are tooling fees required for battery cable assembly?
Submit RFQ
Submit Your Battery Cable Assembly Drawing.
Send the drawing, BOM, or part number plus annual volume. Engineering desk acknowledges the RFQ the same working day (Mon–Fri) and sends the quotation within 3 working days.

Reviewed by
Chen Zhongyong — Department Head · Wire Harness, XUDONG Philippines
Philippines-based, with years of factory management experience across the Cavite wire-harness operation. Coordinates every production stage — from drawing and BOM review through crimping, assembly, and test — with strong wire-harness production-coordination capability.
Next Step
Ready For Your Battery Cable Assembly Quote?
Send the drawing, BOM, or part number. We acknowledge your RFQ the same working day; the quotation follows within 3 working days. No obligation.