Cables · Edp Cable
Edp Cable: Cut, Crimped And 100% Continuity Tested.
Edp Cable programs built on the Cavite floor — Philippine origin that is not subject to the China-specific Section 301 tariffs, IPC/WHMA-A-620 Class 2 acceptance by default, Class 3 on request. Send the drawing or part number and we acknowledge the RFQ the same working day (Mon–Fri) and send the quotation within 3 working days.

Buyer Reality
Common eDP Cable Build Problems.
Issue #01
Skew and loss on eDP display links
eDP links have loss and skew budgets set by the display interface. Cable type and lengths follow your drawing; signal-integrity testing is not available in Cavite.
Issue #02
40-pin LVDS connector backshell ground-paddle floats
I-PEX CABLINE-CA II 40-pin assemblies can short to chassis when too much solder is applied at the ground paddle. Solder joints follow the connector maker's application specification and are visually inspected.
Issue #03
Micro-coax 40 AWG drain-wire breaks at coverlay edge
40 AWG silver-plated copper drain wires fatigue at the coverlay step transition under repeated lid open/close.
What We Build
eDP Cable Equipment and Process in Cavite.
Edp cable solder and crimp terminations in Cavite
Cavite has 4 hand-soldering stations, a tunnel heat-shrink machine, one Easy360S automatic crimper with crimp-force monitoring, 10 semi-automatic presses and 30 applicators. Solder joints and crimps are inspected to IPC/WHMA-A-620 Class 2 by default, Class 3 when the drawing calls for it.
100% continuity testing, sampled pull and cross-section checks
Every edp cable is continuity-tested on a QJ100-256 tester. Crimp pull force (TSD-010 tester) and cross-sections (TSA-001 analyser) are checked per the approved sampling plan, lots are sampled to AQL S-2, and inspection records are kept for 3 years.
What is not done in Cavite for edp cable
Cavite has no VNA, eye-diagram or EMC equipment, so impedance, return-loss and signal-integrity limits are not tested in Cavite. The quotation states who tests them (Hebei Cloom or an outside lab) or that the limit rests on the cable and connector maker's data.
100% continuity test on a QJ100-256 tester in Cavite
Philippine origin outside the China-specific Section 301 tariffs
Easy360S automatic crimping with crimp-force monitoring, plus 10 semi-automatic presses
FAQ
eDP Cable FAQs: MOQ, Lead Time, Testing.
Q.01What is the minimum order quantity for edp cable?
+
What is the minimum order quantity for edp cable?
Q.02What lead time do you commit to on edp cable after RFQ?
+
What lead time do you commit to on edp cable after RFQ?
Q.03Are edp cable shipments subject to the China Section 301 tariffs when imported into the US?
+
Are edp cable shipments subject to the China Section 301 tariffs when imported into the US?
Q.04Do you ship edp cable samples for free?
+
Do you ship edp cable samples for free?
Q.05Can you handle the edp cable engineering review before we have a finalized drawing?
+
Can you handle the edp cable engineering review before we have a finalized drawing?
Q.06Do you build paid edp cable prototypes?
+
Do you build paid edp cable prototypes?
Q.07How do you protect edp cable drawings and IP?
+
How do you protect edp cable drawings and IP?
Q.08Which certificates and records ship with edp cable lots?
+
Which certificates and records ship with edp cable lots?
Q.09What payment terms apply to edp cable orders?
+
What payment terms apply to edp cable orders?
Q.10How fast is the quotation for edp cable drawings?
+
How fast is the quotation for edp cable drawings?
Submit RFQ
Submit Your eDP Cable Drawing.
Send the drawing, BOM, or part number plus annual volume. Engineering desk acknowledges the RFQ the same working day (Mon–Fri) and sends the quotation within 3 working days.

Reviewed by
Chen Zhongyong — Department Head · Wire Harness, XUDONG Philippines
Philippines-based, with years of factory management experience across the Cavite wire-harness operation. Coordinates every production stage — from drawing and BOM review through crimping, assembly, and test — with strong wire-harness production-coordination capability.
Next Step
Ready For Your Edp Cable Quote?
Send the drawing, BOM, or part number. We acknowledge your RFQ the same working day; the quotation follows within 3 working days. No obligation.