Cable Assembly · SMA Cable Assembly
SMA Cable Assembly: Built To IPC/WHMA-A-620 Class 2 Or 3.
SMA Cable Assembly programs built on the Cavite floor — Philippine origin outside the China-specific Section 301 tariffs, IPC/WHMA-A-620 Class 2 acceptance by default, Class 3 on request. Send the drawing or part number and we acknowledge the RFQ the same working day (Mon–Fri) and send the quotation within 3 working days.

Buyer Reality
Common SMA Cable Assembly Build Problems.
Issue #01
Excess torque can damage SMA connectors
Follow the connector manufacturer's torque instructions to protect the dielectric and mating interface.
Issue #02
Contact wear during repeated mating
Review connector mating requirements and contact wear as part of the application test plan.
Issue #03
Mating SMA to RP-SMA cross-thread on field swap
RP-SMA centre-pin reversal causes field techs to mate to standard SMA and crush the dielectric.
Issue #04
Contact damage during handling
Protect connector contacts during assembly, storage, and shipment to avoid abrasion.
What We Build
SMA Cable Assembly Equipment and Process in Cavite.
SMA assembly torque control
Use the specified assembly torque and confirm tool settings against the connector instructions.
Connector mating requirements
Agree mating-cycle acceptance criteria and electrical checks in the customer test plan.
Coaxial crimp setup
Select ferrules and crimp tooling for the approved cable and connector combination.
Sma cable assembly solder and crimp terminations in Cavite
Cavite has 4 hand-soldering stations, a tunnel heat-shrink machine, one Easy360S automatic crimper with crimp-force monitoring, 10 semi-automatic presses and 30 applicators. Solder joints and crimps are inspected to IPC/WHMA-A-620 Class 2 by default, Class 3 when the drawing calls for it.
100% continuity testing, sampled pull and cross-section checks
Every sma cable assembly is continuity-tested on a QJ100-256 tester. Crimp pull force (TSD-010 tester) and cross-sections (TSA-001 analyser) are checked per the approved sampling plan, lots are sampled to AQL S-2, and inspection records are kept for 3 years.
What is not done in Cavite for sma cable assembly
Cavite has no VNA, eye-diagram or EMC equipment, so impedance, return-loss and signal-integrity limits are not tested in Cavite. The quotation states who tests them (Hebei Cloom or an outside lab) or that the limit rests on the cable and connector maker's data.
Qualifying Philippine origin outside the China-specific Section 301 tariffs
18-28 working days for prototype custom overmold tooling to first shot / first article at China partner Hebei Cloom
IP-rating, salt-spray and other environmental tests run by third-party labs when the drawing calls for them
FAQ
SMA Cable Assembly FAQs: MOQ, Lead Time, Testing.
Q.01What is the minimum order quantity for sma cable assembly?
+
What is the minimum order quantity for sma cable assembly?
Q.02What lead time do you commit to on sma cable assembly after RFQ?
+
What lead time do you commit to on sma cable assembly after RFQ?
Q.03Are sma cable assembly shipments subject to the China Section 301 tariffs?
+
Are sma cable assembly shipments subject to the China Section 301 tariffs?
Q.04Do you ship sma cable assembly samples for free?
+
Do you ship sma cable assembly samples for free?
Q.05Can you handle the sma cable assembly engineering review before we have a finalized drawing?
+
Can you handle the sma cable assembly engineering review before we have a finalized drawing?
Q.06Can sma cable assembly samples ship before tooling?
+
Can sma cable assembly samples ship before tooling?
Q.07How are sma cable assembly field issues reviewed?
+
How are sma cable assembly field issues reviewed?
Q.08Do you check sma cable assembly manufacturability before quoting?
+
Do you check sma cable assembly manufacturability before quoting?
Q.09What is the sample policy for sma cable assembly?
+
What is the sample policy for sma cable assembly?
Industries
Capabilities
Submit RFQ
Submit Your SMA Cable Assembly Drawing.
Send the drawing, BOM, or part number plus annual volume. Engineering desk acknowledges the RFQ the same working day (Mon–Fri) and sends the quotation within 3 working days.

Reviewed by
Chen Zhongyong — Department Head · Wire Harness, XUDONG Philippines
Philippines-based, with years of factory management experience across the Cavite wire-harness operation. Coordinates every production stage — from drawing and BOM review through crimping, assembly, and test — with strong wire-harness production-coordination capability.
Next Step
Ready For Your Sma Cable Assembly Quote?
Send the drawing, BOM, or part number. We acknowledge your RFQ the same working day; the quotation follows within 3 working days. No obligation.