Cable Assembly · RF Cable Assembly
RF Cable Assembly: Built To IPC/WHMA-A-620 Class 2 Or 3.
RF Cable Assembly programs built on the Cavite floor — Philippine origin outside the China-specific Section 301 tariffs, IPC/WHMA-A-620 Class 2 acceptance by default, Class 3 on request. Send the drawing or part number and we acknowledge the RFQ the same working day (Mon–Fri) and send the quotation within 3 working days.

Buyer Reality
Common RF Cable Assembly Build Problems.
Issue #01
Temperature changes affect phase stability
RF cable selection should account for operating temperature and the required signal performance.
Issue #02
Dielectric crush at a tight bend radius
Bending a coax cable tighter than its rated minimum radius can deform the dielectric and shift impedance. We build to the bend radius on your drawing and the cable maker's data sheet.
Issue #03
Connector plating corrosion in salt exposure
Plated connector bodies can corrode in salt or marine exposure. Plating and body material follow your BOM; salt-spray tests, where specified, are run by third-party labs.
What We Build
RF Cable Assembly Equipment and Process in Cavite.
RF cable material review
Review dielectric materials and supplier data against the application requirements before approving the cable.
Outdoor connector material selection
Choose connector shell materials and finishes to suit the specified exposure conditions.
Rf cable assembly solder and crimp terminations in Cavite
Cavite has 4 hand-soldering stations, a tunnel heat-shrink machine, one Easy360S automatic crimper with crimp-force monitoring, 10 semi-automatic presses and 30 applicators. Solder joints and crimps are inspected to IPC/WHMA-A-620 Class 2 by default, Class 3 when the drawing calls for it.
100% continuity testing, sampled pull and cross-section checks
Every rf cable assembly is continuity-tested on a QJ100-256 tester. Crimp pull force (TSD-010 tester) and cross-sections (TSA-001 analyser) are checked per the approved sampling plan, lots are sampled to AQL S-2, and inspection records are kept for 3 years.
What is not done in Cavite for rf cable assembly
Cavite has no VNA, eye-diagram or EMC equipment, so impedance, return-loss and signal-integrity limits are not tested in Cavite. The quotation states who tests them (Hebei Cloom or an outside lab) or that the limit rests on the cable and connector maker's data. IP-rating, salt-spray and other environmental tests are run by third-party labs.
18-28 working days for prototype custom overmold tooling to first shot / first article at China partner Hebei Cloom
Same-day RFQ acknowledgement (Mon–Fri); quotation within 3 working days
Philippine origin for qualifying Cavite builds
FAQ
RF Cable Assembly FAQs: MOQ, Lead Time, Testing.
Q.01What is the minimum order quantity for rf cable assembly?
+
What is the minimum order quantity for rf cable assembly?
Q.02What lead time do you commit to on rf cable assembly after RFQ?
+
What lead time do you commit to on rf cable assembly after RFQ?
Q.03Are rf cable assembly shipments subject to the China Section 301 tariffs?
+
Are rf cable assembly shipments subject to the China Section 301 tariffs?
Q.04Do you ship rf cable assembly samples for free?
+
Do you ship rf cable assembly samples for free?
Q.05Can you handle the rf cable assembly engineering review before we have a finalized drawing?
+
Can you handle the rf cable assembly engineering review before we have a finalized drawing?
Q.06Do you build paid rf cable assembly prototypes?
+
Do you build paid rf cable assembly prototypes?
Q.07How do you protect rf cable assembly drawings and IP?
+
How do you protect rf cable assembly drawings and IP?
Q.08Which certificates and records ship with rf cable assembly lots?
+
Which certificates and records ship with rf cable assembly lots?
Q.09What payment terms apply to rf cable assembly orders?
+
What payment terms apply to rf cable assembly orders?
Q.10How fast is the quotation for rf cable assembly drawings?
+
How fast is the quotation for rf cable assembly drawings?
Related Builds
Industries
Capabilities
Submit RFQ
Submit Your RF Cable Assembly Drawing.
Send the drawing, BOM, or part number plus annual volume. Engineering desk acknowledges the RFQ the same working day (Mon–Fri) and sends the quotation within 3 working days.

Reviewed by
Chen Zhongyong — Department Head · Wire Harness, XUDONG Philippines
Philippines-based, with years of factory management experience across the Cavite wire-harness operation. Coordinates every production stage — from drawing and BOM review through crimping, assembly, and test — with strong wire-harness production-coordination capability.
Next Step
Ready For Your Rf Cable Assembly Quote?
Send the drawing, BOM, or part number. We acknowledge your RFQ the same working day; the quotation follows within 3 working days. No obligation.