Cables · TC-ER Certified Power Cable
TC-ER Power Cable: Cut, Crimped And 100% Continuity Tested.
TC-ER Certified Power Cable programs built on the Cavite floor — Philippine origin that is not subject to the China-specific Section 301 tariffs, IPC/WHMA-A-620 Class 2 acceptance by default, Class 3 on request. Send the drawing or part number and we acknowledge the RFQ the same working day (Mon–Fri) and send the quotation within 3 working days.

Buyer Reality
Common TC-ER Power Cable Assembly Build Problems.
Issue #01
TC-ER tray cable: UL 1685 vs IEEE 1202 flame listings
Passing one vertical-tray flame test does not mean passing another; UL 1685 and IEEE 1202 use different burner setups. The flame rating follows the cable maker's listing for the part on your BOM; flame tests are not run in Cavite.
Issue #02
Jacket cracking on cold bends
Some jackets crack when bent tightly in the cold. Jacket material and bend radius follow your drawing.
Issue #03
Direct-burial suitability requires the correct cable listing
TC-ER cable identified for direct burial can be buried without armor or duct; the TC-ER designation alone does not establish direct-burial suitability.
Issue #04
Sunlight resistance for outdoor cable jackets
Jackets without a sunlight-resistance rating can degrade under UV. Specify the rated cable on your drawing; UV exposure tests, where specified, are run by third-party labs.
Issue #05
Voltage rating mismatch on tray cable
Tray cable must carry the voltage rating the application needs. Cable rating follows your BOM; we flag a mismatch at drawing review if we see one.
What We Build
TC-ER Power Cable Assembly Equipment and Process in Cavite.
Tc-er power cable assembly crimping: Easy360S with crimp-force monitoring
Cavite runs one Easy360S automatic crimper with crimp-force monitoring, 10 semi-automatic presses and 30 applicators, and 4 wire cutters holding ±0.2 mm. Plant-wide range: wire from 30 AWG to 120 mm², up to 128 circuits, lengths from 15 mm to 50 m; the configuration for your cable is confirmed per drawing.
100% continuity testing, sampled pull and cross-section checks
Every tc-er power cable assembly is continuity-tested on a QJ100-256 tester. Crimp pull force (TSD-010 tester) and cross-sections (TSA-001 analyser) are checked per the approved sampling plan, lots are sampled to AQL S-2, and inspection records are kept for 3 years.
What is not done in Cavite for tc-er power cable assembly
HiPot (dielectric withstand) testing is not done in Cavite; where the drawing requires it, the test is done at Hebei Cloom, China, and the quotation states the route.
Philippine origin for qualifying Cavite builds
IP-rating, salt-spray and other environmental tests run by third-party labs when the drawing calls for them
Same-day RFQ acknowledgement (Mon–Fri); quotation within 3 working days
FAQ
TC-ER Power Cable Assembly FAQs: MOQ, Lead Time, Testing.
Q.01What is the minimum order quantity for tc-er power cable assembly?
+
What is the minimum order quantity for tc-er power cable assembly?
Q.02What lead time do you commit to on tc-er power cable assembly after RFQ?
+
What lead time do you commit to on tc-er power cable assembly after RFQ?
Q.03Are tc-er power cable assembly shipments subject to the China Section 301 tariffs when imported into the US?
+
Are tc-er power cable assembly shipments subject to the China Section 301 tariffs when imported into the US?
Q.04Do you ship tc-er power cable assembly samples for free?
+
Do you ship tc-er power cable assembly samples for free?
Q.05Can you handle the tc-er power cable assembly engineering review before we have a finalized drawing?
+
Can you handle the tc-er power cable assembly engineering review before we have a finalized drawing?
Q.06How is tc-er power cable assembly packed for shipment?
+
How is tc-er power cable assembly packed for shipment?
Q.07Can you support PPAP Level 3 for tc-er power cable assembly?
+
Can you support PPAP Level 3 for tc-er power cable assembly?
Q.08How are tc-er power cable assembly failures screened before shipment?
+
How are tc-er power cable assembly failures screened before shipment?
Q.09What warranty applies to tc-er power cable assembly?
+
What warranty applies to tc-er power cable assembly?
Q.10Are tooling fees required for tc-er power cable assembly?
+
Are tooling fees required for tc-er power cable assembly?
Submit RFQ
Submit Your TC-ER Certified Power Cable Drawing.
Send the drawing, BOM, or part number plus annual volume. Engineering desk acknowledges the RFQ the same working day (Mon–Fri) and sends the quotation within 3 working days. Standards reference: IATF 16949 certificate held by Hebei Cloom, China (not Cavite).

Reviewed by
Chen Zhongyong — Department Head · Wire Harness, XUDONG Philippines
Philippines-based, with years of factory management experience across the Cavite wire-harness operation. Coordinates every production stage — from drawing and BOM review through crimping, assembly, and test — with strong wire-harness production-coordination capability.
Next Step
Ready For Your Tc-Er Power Cable Assembly Quote?
Send the drawing, BOM, or part number. We acknowledge your RFQ the same working day; the quotation follows within 3 working days. No obligation.