Cable Assembly · Power Cable Assembly
Power Cable Assembly: Built To IPC/WHMA-A-620 Class 2 Or 3.
Power Cable Assembly programs built on the Cavite floor — Philippine origin outside the China-specific Section 301 tariffs, IPC/WHMA-A-620 Class 2 acceptance by default, Class 3 on request. Send the drawing or part number and we acknowledge the RFQ the same working day (Mon–Fri) and send the quotation within 3 working days.

Buyer Reality
Common Power Cable Assembly Build Problems.
Issue #01
Heat rise at an under-crimped power lug
A lug crimped outside its specified crimp height runs hot under load. Lug crimps are pull-tested (TSD-010) and cross-sectioned (TSA-001) per the sampling plan.
Issue #02
Tin whisker risk on tin-plated terminals
Pure-tin plating can grow whiskers over time. Terminal plating follows your BOM; we do not substitute finishes without approval.
Issue #03
Lug bolt torque loss through temperature cycles
Bolted lug joints can lose clamp load through temperature cycling. Torque and hardware follow your drawing.
Issue #04
Power harness fuse-block back-out on equipment vibration
Open-frame fuse blocks back-out below UL 4248 retention spec on motor-skid vibration.
Issue #05
Power harness flexible silicone jacket attacks PVC adjacent harness
Silicone plasticiser bleeds into adjacent PVC jackets in tight bundles, creating a risk of PVC embrittlement.
What We Build
Power Cable Assembly Equipment and Process in Cavite.
Power cable assembly crimping: Easy360S with crimp-force monitoring
Cavite runs one Easy360S automatic crimper with crimp-force monitoring, 10 semi-automatic presses and 30 applicators, and 4 wire cutters holding ±0.2 mm. Wire from 30 AWG to 120 mm², up to 128 circuits, lengths from 15 mm to 50 m.
100% continuity testing, sampled pull and cross-section checks
Every power cable assembly is continuity-tested on a QJ100-256 tester. Crimp pull force (TSD-010 tester) and cross-sections (TSA-001 analyser) are checked per the approved sampling plan, lots are sampled to AQL S-2, and inspection records are kept for 3 years.
What is not done in Cavite for power cable assembly
HiPot (dielectric withstand) testing is not done in Cavite; where the drawing requires it, the test is done at Hebei Cloom, China, and the quotation states the route. Overmolding and mold tooling are done at Hebei Cloom, China, not in Cavite.
Easy360S automatic crimping with crimp-force monitoring, plus 10 semi-automatic presses
Sample-level PPAP and first-article inspection (FAI) on request
Pull test (TSD-010) and crimp cross-section (TSA-001) per the approved sampling plan; records kept 3 years
FAQ
Power Cable Assembly FAQs: MOQ, Lead Time, Testing.
Q.01What is the minimum order quantity for power cable assembly?
+
What is the minimum order quantity for power cable assembly?
Q.02What lead time do you commit to on power cable assembly after RFQ?
+
What lead time do you commit to on power cable assembly after RFQ?
Q.03Are power cable assembly shipments subject to the China Section 301 tariffs?
+
Are power cable assembly shipments subject to the China Section 301 tariffs?
Q.04Do you ship power cable assembly samples for free?
+
Do you ship power cable assembly samples for free?
Q.05Can you handle the power cable assembly engineering review before we have a finalized drawing?
+
Can you handle the power cable assembly engineering review before we have a finalized drawing?
Q.06Can power cable assembly samples ship before tooling?
+
Can power cable assembly samples ship before tooling?
Q.07How are power cable assembly field issues reviewed?
+
How are power cable assembly field issues reviewed?
Q.08Do you check power cable assembly manufacturability before quoting?
+
Do you check power cable assembly manufacturability before quoting?
Q.09What is the sample policy for power cable assembly?
+
What is the sample policy for power cable assembly?
Related Builds
Industries
Capabilities
Submit RFQ
Submit Your Power Cable Assembly Drawing.
Send the drawing, BOM, or part number plus annual volume. Engineering desk acknowledges the RFQ the same working day (Mon–Fri) and sends the quotation within 3 working days.

Reviewed by
Chen Zhongyong — Department Head · Wire Harness, XUDONG Philippines
Philippines-based, with years of factory management experience across the Cavite wire-harness operation. Coordinates every production stage — from drawing and BOM review through crimping, assembly, and test — with strong wire-harness production-coordination capability.
Next Step
Ready For Your Power Cable Assembly Quote?
Send the drawing, BOM, or part number. We acknowledge your RFQ the same working day; the quotation follows within 3 working days. No obligation.