Connectors · Fakra Connector
Fakra Connector: OEM-Spec Crimp Library.
Specify the FAKRA housing code, mating part numbers, cable type, length and RF acceptance limits. Cavite builds production cable assemblies for Philippine supply; samples are made at Hebei Cloom, China. Same-day acknowledgement (Mon–Fri).
Buyer Reality
Common FAKRA Connector Build Problems.
Issue #01
FAKRA housing code and mating-part mismatch
Identify the required housing code and mating part numbers on the drawing. Color alone is not enough to approve a mating pair.
Issue #02
RF acceptance depends on the terminated cable
Specify the operating band, impedance, insertion loss and any intermodulation requirement. The quote confirms the applicable test method, equipment and responsible site or laboratory.
Issue #03
Overmold processing can disturb the cable dielectric
Cable construction and the overmold process must be reviewed together.
Issue #04
Contact wear during repeated mating
Use the selected connector supplier’s mating-cycle and plating specifications. Qualification samples and acceptance limits are agreed for the program.
Issue #05
Latch retention after environmental exposure
Define the installation temperature and mechanical loading before selecting the housing.
What We Build
FAKRA Connector Equipment and Process in Cavite.
Housing code and key review
Identify each FAKRA housing code and connector part number against its vehicle-module signal on the BOM. Confirm the complete mating pair before sample release.
Outer-conductor crimp acceptance
Use the selected contact and cable supplier’s application requirements. Crimp dimensions, pull sampling and cross-section checks are included where specified in the agreed inspection plan.
Fakra connector crimping: Easy360S with crimp-force monitoring
Cavite runs one Easy360S automatic crimper with crimp-force monitoring, 10 semi-automatic presses and 30 applicators, and 4 wire cutters holding ±0.2 mm. Wire from 30 AWG to 120 mm², up to 128 circuits, lengths from 15 mm to 50 m.
100% continuity testing, sampled pull and cross-section checks
Every fakra connector is continuity-tested on a QJ100-256 tester. Crimp pull force (TSD-010 tester) and cross-sections (TSA-001 analyser) are checked per the approved sampling plan, lots are sampled to AQL S-2, and inspection records are kept for 3 years.
What is not done in Cavite for fakra connector
Cavite has no VNA, eye-diagram or EMC equipment, so impedance, return-loss and signal-integrity limits are not tested in Cavite. The quotation states who tests them (Hebei Cloom or an outside lab) or that the limit rests on the cable and connector maker's data.
Pull test (TSD-010) and crimp cross-section (TSA-001) per the approved sampling plan; records kept 3 years
ISO 9001 and IATF 16949 certificates held by Hebei Cloom, China, not Cavite; IPC/WHMA-A-620 workmanship per the agreed program
100% continuity test on a QJ100-256 tester in Cavite
FAQ
FAKRA Connector FAQs: MOQ, Lead Time, Testing.
Q.01What is the minimum order quantity for fakra connector?
+
What is the minimum order quantity for fakra connector?
Q.02What lead time do you commit to on fakra connector after RFQ?
+
What lead time do you commit to on fakra connector after RFQ?
Q.03Do fakra connector shipments avoid the China Section 301 tariffs into the US?
+
Do fakra connector shipments avoid the China Section 301 tariffs into the US?
Q.04Do you ship fakra connector samples for free?
+
Do you ship fakra connector samples for free?
Q.05Can you handle the fakra connector engineering review before we have a finalized drawing?
+
Can you handle the fakra connector engineering review before we have a finalized drawing?
Q.06How is fakra connector packed for shipment?
+
How is fakra connector packed for shipment?
Q.07Can you support PPAP Level 3 for fakra connector?
+
Can you support PPAP Level 3 for fakra connector?
Q.08How are fakra connector failures screened before shipment?
+
How are fakra connector failures screened before shipment?
Q.09What warranty applies to fakra connector?
+
What warranty applies to fakra connector?
Q.10Are tooling fees required for fakra connector?
+
Are tooling fees required for fakra connector?
Submit RFQ
Submit Your FAKRA Connector Drawing.
Send the drawing, BOM, or part number plus annual volume. Engineering desk acknowledges the RFQ the same working day (Mon–Fri) and sends the quotation within 3 working days.

Reviewed by
Chen Zhongyong — Department Head · Wire Harness, XUDONG Philippines
Philippines-based, with years of factory management experience across the Cavite wire-harness operation. Coordinates every production stage — from drawing and BOM review through crimping, assembly, and test — with strong wire-harness production-coordination capability.
Next Step
Ready For Your Fakra Connector Quote?
Send the drawing, BOM, or part number. We acknowledge your RFQ the same working day; the quotation follows within 3 working days. No obligation.