Cable Assembly · Control Cable Assembly
Control Cable Assembly: Built To IPC/WHMA-A-620 Class 2 Or 3.
Control Cable Assembly programs built on the Cavite floor — Philippine origin outside the China-specific Section 301 tariffs, IPC/WHMA-A-620 Class 2 acceptance by default, Class 3 on request. Send the drawing or part number and we acknowledge the RFQ the same working day (Mon–Fri) and send the quotation within 3 working days.

Buyer Reality
Common Control Cable Assembly Build Problems.
Issue #01
Missing CAN terminator after field rework
A CAN segment cut and re-pinned in the field can lose its terminator. Terminator location follows your network drawing; we build it where shown.
Issue #02
Modbus RS485 ground-loop on long industrial run
Two-wire RS485 over 100 m with two grounded equipment chassis hums DC offset onto the bus.
Issue #03
PROFINET cable length and timing
PROFINET segments have length limits set by the network design. Cable type and length follow your drawing.
Issue #04
Encoder cable insulation at low temperature
Insulation that stiffens in the cold can affect encoder cables on moving axes. Cable type and temperature rating follow your drawing.
Issue #05
Control harness chemical-attack from cutting-fluid in machine tool
PVC control harnesses can be vulnerable to cutting-fluid exposure on machine tools. Review PUR-jacketed cable options against DIN VDE 0207-13 where specified, and validate compatibility with the actual fluid and operating conditions.
What We Build
Control Cable Assembly Equipment and Process in Cavite.
Control cable assembly crimping: Easy360S with crimp-force monitoring
Cavite runs one Easy360S automatic crimper with crimp-force monitoring, 10 semi-automatic presses and 30 applicators, and 4 wire cutters holding ±0.2 mm. Wire from 30 AWG to 120 mm², up to 128 circuits, lengths from 15 mm to 50 m.
100% continuity testing, sampled pull and cross-section checks
Every control cable assembly is continuity-tested on a QJ100-256 tester. Crimp pull force (TSD-010 tester) and cross-sections (TSA-001 analyser) are checked per the approved sampling plan, lots are sampled to AQL S-2, and inspection records are kept for 3 years.
What is not done in Cavite for control cable assembly
HiPot (dielectric withstand) testing is not done in Cavite; where the drawing requires it, the test is done at Hebei Cloom, China, and the quotation states the route.
Philippine origin for qualifying Cavite builds
ISO 9001 and IATF 16949 certificates held by Hebei Cloom, China, not Cavite; IPC/WHMA-A-620 workmanship per the agreed program
Sample-level PPAP and first-article inspection (FAI) on request
FAQ
Control Cable Assembly FAQs: MOQ, Lead Time, Testing.
Q.01What is the minimum order quantity for control cable assembly?
+
What is the minimum order quantity for control cable assembly?
Q.02What lead time do you commit to on control cable assembly after RFQ?
+
What lead time do you commit to on control cable assembly after RFQ?
Q.03Are control cable assembly shipments subject to the China Section 301 tariffs?
+
Are control cable assembly shipments subject to the China Section 301 tariffs?
Q.04Do you ship control cable assembly samples for free?
+
Do you ship control cable assembly samples for free?
Q.05Can you handle the control cable assembly engineering review before we have a finalized drawing?
+
Can you handle the control cable assembly engineering review before we have a finalized drawing?
Q.06Do you build paid control cable assembly prototypes?
+
Do you build paid control cable assembly prototypes?
Q.07How do you protect control cable assembly drawings and IP?
+
How do you protect control cable assembly drawings and IP?
Q.08Which certificates and records ship with control cable assembly lots?
+
Which certificates and records ship with control cable assembly lots?
Q.09What payment terms apply to control cable assembly orders?
+
What payment terms apply to control cable assembly orders?
Q.10How fast is the quotation for control cable assembly drawings?
+
How fast is the quotation for control cable assembly drawings?
Related Builds
Industries
Capabilities
Submit RFQ
Submit Your Control Cable Assembly Drawing.
Send the drawing, BOM, or part number plus annual volume. Engineering desk acknowledges the RFQ the same working day (Mon–Fri) and sends the quotation within 3 working days.

Reviewed by
Chen Zhongyong — Department Head · Wire Harness, XUDONG Philippines
Philippines-based, with years of factory management experience across the Cavite wire-harness operation. Coordinates every production stage — from drawing and BOM review through crimping, assembly, and test — with strong wire-harness production-coordination capability.
Next Step
Ready For Your Control Cable Assembly Quote?
Send the drawing, BOM, or part number. We acknowledge your RFQ the same working day; the quotation follows within 3 working days. No obligation.