Cable Assembly · Shielded Cable Assembly
Shielded Cable Assembly: Built To IPC/WHMA-A-620 Class 2 Or 3.
Shielded Cable Assembly programs built on the Cavite floor — Philippine origin outside the China-specific Section 301 tariffs, IPC/WHMA-A-620 Class 2 acceptance by default, Class 3 on request. Send the drawing or part number and we acknowledge the RFQ the same working day (Mon–Fri) and send the quotation within 3 working days.

Buyer Reality
Common Shielded Cable Assembly Build Problems.
Issue #01
Pigtail shield drains and EMI
Long pigtail drains radiate more than 360° shield bonds. Shield termination follows your drawing; EMC testing is not available in Cavite.
Issue #02
Foil-only shield tearing at the boot exit
Foil-only shields can tear where the cable exits the boot. Shield construction and strain relief follow your drawing.
Issue #03
Twist pitch on shielded pairs
Twist-pitch drift weakens a pair's noise rejection. Cable part number follows your BOM; signal testing is not available in Cavite.
Issue #04
Shield grounding philosophy mismatch — 1-end vs 2-end
Customer drawing says 1-end ground, harness shop builds 2-end and creates a ground loop.
What We Build
Shielded Cable Assembly Equipment and Process in Cavite.
Shielded cable assembly crimping: Easy360S with crimp-force monitoring
Cavite runs one Easy360S automatic crimper with crimp-force monitoring, 10 semi-automatic presses and 30 applicators, and 4 wire cutters holding ±0.2 mm. Wire from 30 AWG to 120 mm², up to 128 circuits, lengths from 15 mm to 50 m.
100% continuity testing, sampled pull and cross-section checks
Every shielded cable assembly is continuity-tested on a QJ100-256 tester. Crimp pull force (TSD-010 tester) and cross-sections (TSA-001 analyser) are checked per the approved sampling plan, lots are sampled to AQL S-2, and inspection records are kept for 3 years.
What is not done in Cavite for shielded cable assembly
Cavite has no VNA, eye-diagram or EMC equipment, so impedance, return-loss and signal-integrity limits are not tested in Cavite. The quotation states who tests them (Hebei Cloom or an outside lab) or that the limit rests on the cable and connector maker's data.
Same-day RFQ acknowledgement (Mon–Fri); quotation within 3 working days
18-28 working days for prototype custom overmold tooling to first shot / first article at China partner Hebei Cloom
ISO 9001 and IATF 16949 certificates held by Hebei Cloom, China, not Cavite; IPC/WHMA-A-620 workmanship per the agreed program
FAQ
Shielded Cable Assembly FAQs: MOQ, Lead Time, Testing.
Q.01What is the minimum order quantity for shielded cable assembly?
+
What is the minimum order quantity for shielded cable assembly?
Q.02What lead time do you commit to on shielded cable assembly after RFQ?
+
What lead time do you commit to on shielded cable assembly after RFQ?
Q.03Are shielded cable assembly shipments subject to the China Section 301 tariffs?
+
Are shielded cable assembly shipments subject to the China Section 301 tariffs?
Q.04Do you ship shielded cable assembly samples for free?
+
Do you ship shielded cable assembly samples for free?
Q.05Can you handle the shielded cable assembly engineering review before we have a finalized drawing?
+
Can you handle the shielded cable assembly engineering review before we have a finalized drawing?
Q.06How is shielded cable assembly packed for shipment?
+
How is shielded cable assembly packed for shipment?
Q.07Can you support PPAP Level 3 for shielded cable assembly?
+
Can you support PPAP Level 3 for shielded cable assembly?
Q.08How are shielded cable assembly failures screened before shipment?
+
How are shielded cable assembly failures screened before shipment?
Q.09What warranty applies to shielded cable assembly?
+
What warranty applies to shielded cable assembly?
Q.10Are tooling fees required for shielded cable assembly?
+
Are tooling fees required for shielded cable assembly?
Related Builds
Industries
Capabilities
Submit RFQ
Submit Your Shielded Cable Assembly Drawing.
Send the drawing, BOM, or part number plus annual volume. Engineering desk acknowledges the RFQ the same working day (Mon–Fri) and sends the quotation within 3 working days.

Reviewed by
Chen Zhongyong — Department Head · Wire Harness, XUDONG Philippines
Philippines-based, with years of factory management experience across the Cavite wire-harness operation. Coordinates every production stage — from drawing and BOM review through crimping, assembly, and test — with strong wire-harness production-coordination capability.
Next Step
Ready For Your Shielded Cable Assembly Quote?
Send the drawing, BOM, or part number. We acknowledge your RFQ the same working day; the quotation follows within 3 working days. No obligation.