Cable Assembly · USB Cable Assembly
USB Cable Assembly: Built To IPC/WHMA-A-620 Class 2 Or 3.
USB Cable Assembly programs built on the Cavite floor — Philippine origin outside the China-specific Section 301 tariffs, IPC/WHMA-A-620 Class 2 acceptance by default, Class 3 on request. Send the drawing or part number and we acknowledge the RFQ the same working day (Mon–Fri) and send the quotation within 3 working days.

Buyer Reality
Common USB Cable Assembly Build Problems.
Issue #01
Voltage drop on long USB-C power cables
Thin conductors on long USB-C power cables can drop voltage at high current. Conductor size and length are reviewed against your drawing and the USB PD power profile you specify.
Issue #02
USB-C plug shell stress on docking mates
Side-loads on a docked USB-C plug stress the shell. Plug grade, overmold and strain relief follow your drawing; overmolding is done at Hebei Cloom, China.
Issue #03
CC1/CC2 short on bent USB-C centre tongue
Hand-soldered centre tongues bend and short CC1 to VBUS during plug rotation.
Issue #04
e-marker chip flagged counterfeit by host MCU
Grey-market USB-C e-marker chips fail the host MCU PD authentication challenge.
What We Build
USB Cable Assembly Equipment and Process in Cavite.
Usb cable assembly solder and crimp terminations in Cavite
Cavite has 4 hand-soldering stations, a tunnel heat-shrink machine, one Easy360S automatic crimper with crimp-force monitoring, 10 semi-automatic presses and 30 applicators. Solder joints and crimps are inspected to IPC/WHMA-A-620 Class 2 by default, Class 3 when the drawing calls for it.
100% continuity testing, sampled pull and cross-section checks
Every usb cable assembly is continuity-tested on a QJ100-256 tester. Crimp pull force (TSD-010 tester) and cross-sections (TSA-001 analyser) are checked per the approved sampling plan, lots are sampled to AQL S-2, and inspection records are kept for 3 years.
What is not done in Cavite for usb cable assembly
Cavite has no VNA, eye-diagram or EMC equipment, so impedance, return-loss and signal-integrity limits are not tested in Cavite. The quotation states who tests them (Hebei Cloom or an outside lab) or that the limit rests on the cable and connector maker's data. Overmolding and mold tooling are done at Hebei Cloom, China, not in Cavite.
18-28 working days for prototype custom overmold tooling to first shot / first article at China partner Hebei Cloom
Sample-level PPAP and first-article inspection (FAI) on request
Qualifying Philippine origin outside the China-specific Section 301 tariffs
FAQ
USB Cable Assembly FAQs: MOQ, Lead Time, Testing.
Q.01What is the minimum order quantity for usb cable assembly?
+
What is the minimum order quantity for usb cable assembly?
Q.02What lead time do you commit to on usb cable assembly after RFQ?
+
What lead time do you commit to on usb cable assembly after RFQ?
Q.03Are usb cable assembly shipments subject to the China Section 301 tariffs?
+
Are usb cable assembly shipments subject to the China Section 301 tariffs?
Q.04Do you ship usb cable assembly samples for free?
+
Do you ship usb cable assembly samples for free?
Q.05Can you handle the usb cable assembly engineering review before we have a finalized drawing?
+
Can you handle the usb cable assembly engineering review before we have a finalized drawing?
Q.06How is usb cable assembly packed for shipment?
+
How is usb cable assembly packed for shipment?
Q.07Can you support PPAP Level 3 for usb cable assembly?
+
Can you support PPAP Level 3 for usb cable assembly?
Q.08How are usb cable assembly failures screened before shipment?
+
How are usb cable assembly failures screened before shipment?
Q.09What warranty applies to usb cable assembly?
+
What warranty applies to usb cable assembly?
Q.10Are tooling fees required for usb cable assembly?
+
Are tooling fees required for usb cable assembly?
Related Builds
Industries
Capabilities
Submit RFQ
Submit Your USB Cable Assembly Drawing.
Send the drawing, BOM, or part number plus annual volume. Engineering desk acknowledges the RFQ the same working day (Mon–Fri) and sends the quotation within 3 working days.

Reviewed by
Chen Zhongyong — Department Head · Wire Harness, XUDONG Philippines
Philippines-based, with years of factory management experience across the Cavite wire-harness operation. Coordinates every production stage — from drawing and BOM review through crimping, assembly, and test — with strong wire-harness production-coordination capability.
Next Step
Ready For Your Usb Cable Assembly Quote?
Send the drawing, BOM, or part number. We acknowledge your RFQ the same working day; the quotation follows within 3 working days. No obligation.