Cables · Gmsl Cable
Gmsl Cable: Cut, Crimped And 100% Continuity Tested.
Gmsl Cable programs built on the Cavite floor — Philippine origin that is not subject to the China-specific Section 301 tariffs, IPC/WHMA-A-620 Class 2 acceptance by default, Class 3 on request. Send the drawing or part number and we acknowledge the RFQ the same working day (Mon–Fri) and send the quotation within 3 working days.

Buyer Reality
Common GMSL Cable Build Problems.
Issue #01
SerDes link budget on long camera cables
SerDes camera links lose lock when cable loss exceeds the chipset's budget. Cable type and length follow your drawing and the chipset maker's guidance.
Issue #02
FAKRA coding key mix-ups
FAKRA keys and colours prevent cross-mating only if the right housing is used. Housing coding follows your BOM, and every assembly is continuity-tested against your pin-out.
Issue #03
Braid coverage on automotive coax
Braid coverage affects EMI performance. Cable part number follows your BOM; EMC testing is not available in Cavite.
Issue #04
GMSL2 ESD strike fries 50 ohm termination at hot-plug
Hot-plug ESD events into a powered MAX96724 deserializer kill the 50 ohm termination if the cable shield is not ESD-bonded to chassis at both ends per ISO 10605.
What We Build
GMSL Cable Equipment and Process in Cavite.
Gmsl cable solder and crimp terminations in Cavite
Cavite has 4 hand-soldering stations, a tunnel heat-shrink machine, one Easy360S automatic crimper with crimp-force monitoring, 10 semi-automatic presses and 30 applicators. Solder joints and crimps are inspected to IPC/WHMA-A-620 Class 2 by default, Class 3 when the drawing calls for it.
100% continuity testing, sampled pull and cross-section checks
Every gmsl cable is continuity-tested on a QJ100-256 tester. Crimp pull force (TSD-010 tester) and cross-sections (TSA-001 analyser) are checked per the approved sampling plan, lots are sampled to AQL S-2, and inspection records are kept for 3 years.
What is not done in Cavite for gmsl cable
Cavite has no VNA, eye-diagram or EMC equipment, so impedance, return-loss and signal-integrity limits are not tested in Cavite. The quotation states who tests them (Hebei Cloom or an outside lab) or that the limit rests on the cable and connector maker's data.
Same-day RFQ acknowledgement (Mon–Fri); quotation within 3 working days
Philippine origin for qualifying Cavite builds
Sample-level PPAP and first-article inspection (FAI) on request
FAQ
GMSL Cable FAQs: MOQ, Lead Time, Testing.
Q.01What is the minimum order quantity for gmsl cable?
+
What is the minimum order quantity for gmsl cable?
Q.02What lead time do you commit to on gmsl cable after RFQ?
+
What lead time do you commit to on gmsl cable after RFQ?
Q.03Are gmsl cable shipments subject to the China Section 301 tariffs when imported into the US?
+
Are gmsl cable shipments subject to the China Section 301 tariffs when imported into the US?
Q.04Do you ship gmsl cable samples for free?
+
Do you ship gmsl cable samples for free?
Q.05Can you handle the gmsl cable engineering review before we have a finalized drawing?
+
Can you handle the gmsl cable engineering review before we have a finalized drawing?
Q.06Can gmsl cable samples ship before tooling?
+
Can gmsl cable samples ship before tooling?
Q.07How are gmsl cable field issues reviewed?
+
How are gmsl cable field issues reviewed?
Q.08Do you check gmsl cable manufacturability before quoting?
+
Do you check gmsl cable manufacturability before quoting?
Q.09What is the sample policy for gmsl cable?
+
What is the sample policy for gmsl cable?
Related Builds
Industries
Capabilities
Submit RFQ
Submit Your GMSL Cable Drawing.
Send the drawing, BOM, or part number plus annual volume. Engineering desk acknowledges the RFQ the same working day (Mon–Fri) and sends the quotation within 3 working days. Standards reference: IATF 16949 certificate held by Hebei Cloom, China (not Cavite).

Reviewed by
Chen Zhongyong — Department Head · Wire Harness, XUDONG Philippines
Philippines-based, with years of factory management experience across the Cavite wire-harness operation. Coordinates every production stage — from drawing and BOM review through crimping, assembly, and test — with strong wire-harness production-coordination capability.
Next Step
Ready For Your Gmsl Cable Quote?
Send the drawing, BOM, or part number. We acknowledge your RFQ the same working day; the quotation follows within 3 working days. No obligation.