Cables · CAN Bus Cable
CAN Bus Cable: Cut, Crimped And 100% Continuity Tested.
CAN Bus Cable programs built on the Cavite floor — Philippine origin that is not subject to the China-specific Section 301 tariffs, IPC/WHMA-A-620 Class 2 acceptance by default, Class 3 on request. Send the drawing or part number and we acknowledge the RFQ the same working day (Mon–Fri) and send the quotation within 3 working days.

Buyer Reality
Common CAN Bus Cable Build Problems.
Issue #01
CAN-H / CAN-L 120 ohm termination mismatch
High-speed CAN is normally terminated with 120 ohm at each end of the bus, and split termination (two 60 ohm resistors) is one optional scheme. Who supplies the terminators, and the cable part number, belong on the drawing so every lot is built the same way.
Issue #02
Twist lay length not specified on the drawing
Twisting the CAN-H / CAN-L pair keeps the two wires coupled to the same noise. If the drawing gives no lay length or cable part number, the build can drift between lots; we ask for the cable spec at quotation.
Issue #03
Stub length not defined for 1 Mbps buses
Longer stubs add reflections at high bit rates. The allowed stub length is set by your transceiver data and network design, so we build to the length on your drawing.
Issue #04
Deutsch DT contact crimp out of spec
A wrong crimp height on a DT contact can open the CAN-H or CAN-L line in the field. Crimps are made with terminal-matched tooling and checked by pull test (TSD-010) and cross-section (TSA-001) per the sampling plan.
Issue #05
CAN FD 5 Mbps grounding needs installation review
CAN FD shield grounding depends on the installation and equipotential bonding; both-end grounding can be appropriate, while ground loops can disturb the bus.
What We Build
CAN Bus Cable Equipment and Process in Cavite.
CAN bus cable crimping: Easy360S with crimp-force monitoring
Cavite runs one Easy360S automatic crimper with crimp-force monitoring, 10 semi-automatic presses and 30 applicators, and 4 wire cutters holding ±0.2 mm. Plant-wide range: wire from 30 AWG to 120 mm², up to 128 circuits, lengths from 15 mm to 50 m; the configuration for your cable is confirmed per drawing.
100% continuity testing, sampled pull and cross-section checks
Every CAN bus cable is continuity-tested on a QJ100-256 tester. Crimp pull force (TSD-010 tester) and cross-sections (TSA-001 analyser) are checked per the approved sampling plan, lots are sampled to AQL S-2, and inspection records are kept for 3 years.
What is not done in Cavite for CAN bus cable
Cavite has no VNA, eye-diagram or EMC equipment, so impedance, return-loss and signal-integrity limits are not tested in Cavite. The quotation states who tests them (Hebei Cloom or an outside lab) or that the limit rests on the cable and connector maker's data.
Order To Shipment
CAN Bus Cable Ordering Process.
- 01
Drawing and quotation
Send the drawing, BOM, quantity and delivery location. We acknowledge the RFQ the same working day (Mon–Fri) and send the quotation within 3 working days, including the termination, twist and test points we need confirmed.
- 02
Samples at Hebei Cloom, China
Samples are built at partner Hebei Cloom in about 15 days (30 days for complex builds). China-built samples are China-origin.
- 03
Sample approval
You check fit and function on your bus. Volume production starts only after you approve the sample; any later drawing change goes through the ECN change process.
- 04
Production in Cavite
Cutting, crimping and assembly run in Cavite: 20 working days, or 10 once all materials are in stock.
- 05
Test and inspection
Every cable is 100% continuity tested on the QJ100-256; pull force and cross-sections are checked per the sampling plan and lots are sampled to AQL S-2. Inspection records are kept for 3 years.
- 06
Packing and shipment
Cavite production ships from the Port of Manila, typically about 7 days by air or 30 days by sea; the mode is confirmed in the quotation.
Philippine origin outside the China-specific Section 301 tariffs
Sample-level PPAP and first-article inspection (FAI) on request
100% continuity test on a QJ100-256 tester in Cavite
FAQ
CAN Bus Cable FAQs: MOQ, Lead Time, Testing.
Q.01What is the minimum order quantity for CAN bus cable?
+
What is the minimum order quantity for CAN bus cable?
Q.02What lead time do you commit to on CAN bus cable after RFQ?
+
What lead time do you commit to on CAN bus cable after RFQ?
Q.03Are CAN bus cable shipments subject to the China Section 301 tariffs when imported into the US?
+
Are CAN bus cable shipments subject to the China Section 301 tariffs when imported into the US?
Q.04Do you ship CAN bus cable samples for free?
+
Do you ship CAN bus cable samples for free?
Q.05Can you handle the CAN bus cable engineering review before we have a finalized drawing?
+
Can you handle the CAN bus cable engineering review before we have a finalized drawing?
Q.06How is CAN bus cable packed for shipment?
+
How is CAN bus cable packed for shipment?
Q.07Can you support PPAP Level 3 for CAN bus cable?
+
Can you support PPAP Level 3 for CAN bus cable?
Q.08How are CAN bus cable failures screened before shipment?
+
How are CAN bus cable failures screened before shipment?
Q.09What warranty applies to CAN bus cable?
+
What warranty applies to CAN bus cable?
Q.10Are tooling fees required for CAN bus cable?
+
Are tooling fees required for CAN bus cable?
Related Builds
Industries
Capabilities
Submit RFQ
Submit Your CAN Bus Cable Drawing.
Send the drawing, BOM, or part number plus annual volume. Engineering desk acknowledges the RFQ the same working day (Mon–Fri) and sends the quotation within 3 working days.

Reviewed by
Chen Zhongyong — Department Head · Wire Harness, XUDONG Philippines
Philippines-based, with years of factory management experience across the Cavite wire-harness operation. Coordinates every production stage — from drawing and BOM review through crimping, assembly, and test — with strong wire-harness production-coordination capability.
Next Step
Ready For Your CAN Bus Cable Quote?
Send the drawing, BOM, or part number. We acknowledge your RFQ the same working day; the quotation follows within 3 working days. No obligation.