Japan · RF / Coax · Power Cable · Cavite Manufacturing
Japan Specialty Cable Assemblies
Specialty cable assemblies from Cavite, Philippines — power cable assemblies built and continuity-tested in Cavite; RF / coax assemblies quoted per cable and connector part number, with Cavite termination confirmed at quotation. Non-China production origin. Built for Japanese manufacturers running a China+1 / BCP / nearshoring strategy that need disciplined quality and a non-China production origin.
Sample fee & freight extra; built at Hebei Cloom, China
Same day
RFQ acknowledgement
Quote within 3 working days
Specialty Cable
Specialty Cable Assemblies: Cavite Equipment, Tests And What Is Confirmed At Quotation.
Power cable assemblies depend on lug crimp integrity and insulation; RF and coax assemblies depend on correct connector seating, which is why their termination is confirmed per part number. The Cavite plant's general equipment includes 4 wire cutters (±0.2 mm), one Easy360S automatic crimper with crimp-force monitoring, 10 semi-automatic presses, 4 hand-soldering stations and one tunnel heat-shrink machine.
Every assembly is 100% continuity-tested on a QJ100-256 tester, and crimp pull force (TSD-010) and cross-sections (TSA-001) are checked per the approved sampling plan. Cavite has no VNA, so if your drawing specifies VSWR, insertion-loss or impedance acceptance, the test method, who runs it and the report format are confirmed at quotation before we accept the order. HiPot, where the drawing requires it, is also done at Hebei Cloom.
Connectors and contacts are sourced to the approved BOM. There is no MOQ (sample fee and freight extra); samples are built at Hebei Cloom, China in about 15 days (30 for complex builds), and the quotation states which tests run in Cavite and which go to Hebei Cloom or an outside lab.
Test Plan Agreed Before The Build
Continuity, pull force and cross-section are checked in Cavite; HiPot is done at Hebei Cloom. Whether RF acceptance can be arranged, who runs it and the report format are confirmed at quotation.
English, Chinese And Japanese Support
Japanese engineering and procurement teams can work with the Cavite desk in Japanese, English or Chinese — the only three languages the team supports. Drawings, drawing questions, inspection records and audit communication for Cavite programs are handled by the Cavite desk in the agreed language.
Lead Time & Logistics For Japan
Production in Cavite takes 20 working days, or 10 once all materials are in stock; samples from Hebei Cloom take 15 days (30 if complex). Cavite production ships from the Port of Manila, typically about 7 days by air or 30 days by sea; transit to your Japanese site is confirmed in the quotation.
Comparison
Specialty Cable Supplier Checklist
Specialty cable buyers need to know which steps a supplier does on site and which go to a partner or lab — before the first sample.
RF / coax termination
Ask each supplier
Which RF tests are offered, and who runs them?
XUDONG · Cavite
Whether Cavite can terminate the cable and connector combination is confirmed per part number at quotation; finished assemblies are 100% continuity-tested, and any VSWR / insertion-loss acceptance is agreed separately (no VNA in Cavite).
Power cable integrity
Ask each supplier
Are lug crimps pull-tested and cross-sectioned?
XUDONG · Cavite
Lug crimps pull-tested (TSD-010) and cross-sectioned (TSA-001) per the approved sampling plan; HiPot at Hebei Cloom where required.
Test transparency
Ask each supplier
Where does each test run?
XUDONG · Cavite
The quotation lists each confirmed test and where it runs.
Records
Ask each supplier
How long are inspection records kept?
XUDONG · Cavite
Inspection records kept for 3 years; lots sampled to AQL S-2.
China+1 / BCP fit for Japanese buyers
Ask each supplier
If one country of origin is disrupted, is a documented second source available?
XUDONG · Cavite
Philippine-origin production gives Japanese teams a documented second source for business-continuity planning, with PEZA export records and inspection records kept for 3 years.
Decision Factor
Ask each supplier
XUDONG · Cavite
RF / coax termination
Which RF tests are offered, and who runs them?
Whether Cavite can terminate the cable and connector combination is confirmed per part number at quotation; finished assemblies are 100% continuity-tested, and any VSWR / insertion-loss acceptance is agreed separately (no VNA in Cavite).
Power cable integrity
Are lug crimps pull-tested and cross-sectioned?
Lug crimps pull-tested (TSD-010) and cross-sectioned (TSA-001) per the approved sampling plan; HiPot at Hebei Cloom where required.
Test transparency
Where does each test run?
The quotation lists each confirmed test and where it runs.
Records
How long are inspection records kept?
Inspection records kept for 3 years; lots sampled to AQL S-2.
China+1 / BCP fit for Japanese buyers
If one country of origin is disrupted, is a documented second source available?
Philippine-origin production gives Japanese teams a documented second source for business-continuity planning, with PEZA export records and inspection records kept for 3 years.
Program Process
How A Program Starts
The fastest way to qualify an overseas supplier is to make the first week concrete: drawing review, engineering questions, sample plan, quality documentation, and export assumptions. That is how we structure the kickoff.
01
Send drawings, BOM, photos, or a sample
DXF, PDF, harness-board photos, connector list, annual volume, target lead time, and required documentation are enough for the first review. We can sign your NDA template before drawings are shared; it is not required for an initial review.
02
Engineering and material review
Cavite engineering checks connector availability, crimp tooling, fixture-board need, cable jacket, test requirements, and any overmold or backshell tooling. We acknowledge the RFQ the same working day; the quotation, with any drawing questions, follows within 3 working days. The quotation includes NPI, pilot, and production pricing.
03
Sample at China partner Hebei Cloom
Samples typically take 15 days (30 for complex builds) at Hebei Cloom, China, and carry China origin. Which inspection records ship with the sample (for example pull-force, cross-section or continuity results) is agreed in the quotation.
04
Sample approval, then production
Production starts after the customer approves the sample. Any later drawing or material change goes through the ECN change process, and lots are sampled to AQL S-2.
05
Production plus export package
The export paperwork for each shipment (for example the PEZA export record, commercial invoice and packing list) is listed in the quotation. Inspection records are kept for 3 years.
Capability Stack
Specialty Cable Capability
Power cable assemblies built in Cavite; RF / coax assessed per part number. The tests each one needs are agreed at quotation.
RF & coax assemblies
Coax and RF assemblies quoted against your cable and connector part numbers; whether Cavite can terminate them is confirmed per part at quotation. 100% continuity testing in Cavite; no VNA, so any VSWR / insertion-loss acceptance is agreed separately.
Power cable assemblies
Lug- and ring-terminated power and battery cables, wire from 30 AWG to 120 mm², with crimp pull and cross-section checks; HiPot at Hebei Cloom where required.
Shielded & hybrid
Shielded and hybrid power-plus-signal assemblies built to the approved drawing, up to 128 circuits and from 15 mm to 50 m long.
Test & inspection
100% continuity on a QJ100-256 tester, pull force (TSD-010) and cross-section (TSA-001) per the approved sampling plan, AQL S-2 sampling.
Environmental tests
IP-rating, salt-spray and other environmental tests run by third-party labs when the drawing calls for them.
Documents
RoHS and REACH declarations on request; sample-level PPAP and first-article inspection (FAI); inspection records kept for 3 years.
Quality & Testing
Specialty Cable Testing: What Runs In Cavite And What Goes Out.
Japanese buyers usually ask which tests run on the Cavite floor. This is the split; the test list for your part is agreed before the build.
Check
Equipment / method
Where
Continuity, every unit
QJ100-256 continuity tester, 100% of assemblies
Where: Cavite
Crimp pull force and cross-section
TSD-010 pull tester and TSA-001 cross-section analyzer, per the agreed inspection plan
Where: Cavite
Final inspection sampling
AQL sampling at inspection level S-2
Where: Cavite
RF performance (VSWR, insertion loss)
Cavite has no VNA; whether, how and by whom RF tests can be arranged is confirmed before order acceptance
Where: To be confirmed at quotation
HiPot on power cables
Where the drawing specifies it
Where: Hebei Cloom, China
Salt fog, IP and other environmental tests
Where specified
Where: Third-party lab
Workmanship and records
IPC/WHMA-A-620 Class 2 by default, Class 3 on request; inspection records kept 3 years
Where: Cavite
Lead Time
Specialty Cable Sample And Production Lead Times For Japan.
Typical times from RFQ to ready-to-ship; transit to Japan is quoted separately. Support is in English, Chinese and Japanese.
Stage
Typical time
Notes
RFQ acknowledgement
Same working day (Mon–Fri)
Reply from the Cavite engineering desk.
Quotation
Within 3 working days
Send the drawing, BOM, quantity and required date so the quote can be completed in one pass.
Samples
About 15 days; 30 days for complex parts
Typically built at partner Hebei Cloom, China, so those samples are China-origin. No MOQ; sample fee and freight are extra.
Production
20 working days; 10 working days once materials are in stock
Cavite production lead time after sample approval; production at Hebei Cloom is scheduled in the quote. Materials are bought to your BOM per order, so material availability, order quantity and your required date set the schedule; include quantity and need date in the RFQ.
Shipment
About 7 days by air, 30 by sea
Cavite production ships from the Port of Manila; express by DHL or FedEx, or on your own carrier account. Transit is not included in the production times above; export documents supplied are listed in the quotation.
Industries the Cavite plant serves: automotive, marine and industrial automation. This is the plant-level scope, not a list of delivered programs for this product.
Source: written answers from the XUDONG Cavite plant, 5 November 2026, and the Cavite / Hebei Cloom split of work confirmed by group management, 6 November 2026; shipping port, typical transit times and carriers confirmed by group management, 9 November 2026. Plant-wide figures; the plan for a specific part is confirmed against its drawing.
Facility
What Cavite Builds And What Hebei Cloom Supports.
Samples and custom prototypes are mainly built at our China partner factory, Hebei Cloom; volume production runs in Cavite or at Hebei Cloom, as the customer requires. Samples built in China are China-origin. Molds are designed and built, including T1 samples, at our China partner factory, Hebei Cloom. Production location is confirmed in the quote.
For a transfer program that balance is the point: close enough to the Asian tooling and connector network to retain engineering leverage, but with a real non-China production origin and an English-speaking interface for overseas buyers.
Certifications & Records
Certificates, Inspection Records And Audit Pack.
The certificate list is only the front page. For active programs, the audit pack covers the agreed inspection plan, inspection records (kept for 3 years), RoHS/REACH declarations, and sample-level PPAP/FAI on request.
CERT.01
ISO 9001:2015
Held by China manufacturing partner Hebei Cloom; the Cavite plant is not separately ISO 9001 certified.
CERT.02
IPC/WHMA-A-620
Cable and wire harness acceptance criteria as the inspection baseline; Class 2 by default, Class 3 acceptance applied where the program specifies it.
CERT.03
RoHS / REACH
BOM-line material compliance declarations available for customer audit packs.
CERT.04
PEZA Export Records
Cavite Economic Zone export records that travel with each export shipment's customs paperwork.
Can you build RF / coax cable assemblies in Cavite?
+
Send the cable and connector part numbers. Whether Cavite can terminate that combination is confirmed in the quotation; finished assemblies get 100% continuity testing on the QJ100-256 tester. Cavite has no VNA, so whether VSWR / insertion-loss acceptance can be arranged, who runs it and the report format are also confirmed at quotation.
Q.02
Can samples be built in China and production move to Cavite?
+
Yes. Samples are mainly built at our China partner factory, Hebei Cloom (China-origin), in about 15 days, or 30 days for complex parts. After you approve the sample, volume production can run in Cavite against the same drawing: 20 working days, or 10 working days once materials are in stock. There is no MOQ; the sample fee and freight are charged separately.
Q.03
What documents can you supply for a Japanese customer approval?
+
Sample-level PPAP and first-article inspection (FAI), RoHS and REACH declarations, and the inspection records for each lot, kept for 3 years. Workmanship is IPC/WHMA-A-620 Class 2 by default, Class 3 on request. IATF 16949 is held by Hebei Cloom; the Cavite plant is not separately certified.
Q.04
Who supports Japanese buyers, and in which languages?
+
Cavite harness and cable programs are quoted and supported directly by the Cavite desk, in Japanese, English or Chinese. RFQs are acknowledged the same working day and quoted within 3 working days.
Q.05
Do you hold stock, and which material documents can you provide?
+
There is no standing stock: wire, connectors and terminals are bought per order to the approved BOM. UL-recognized wire can be purchased when specified in the customer's BOM, protective materials are from Woer and tesa, and RoHS and REACH declarations can be provided.
Submit RFQ
Send The Specialty Cable Spec.
Attach the cable spec, connector list, performance requirement, and annual volume. We acknowledge the RFQ the same working day (Mon–Fri) and send the quotation within 3 working days.
We acknowledge your RFQ the same working day (Mon–Fri); the quotation follows within 3 working days.
Send the drawing, BOM, quantity and delivery location for a sample and production plan.
We can sign your own NDA template before drawings are shared; it is not required for an initial review.